I want definitive answers to these questions:
1. How many construction jobs will there be vs. the estimates provided in the TIF narrative.
2. And of these jobs, how many and what % are going to locals? Locals defined by residents of the Lehigh Valley.
I have now heard from two people who work in trades that the jobs might not go to locals. Ok. Wasn’t this one of the reasons that some who voted for the TIF cited? “X00” construction jobs for the area?
If this is the case I sincerely hope that those who used this rationale to justify the public subsidy are doing whatever they can to encourage and influence the development team to use local labor. It’s my understanding bids are happening now.
My argument was always the shopping center would have been built without the TIF. (an argument justified by the County vote) BUT those elected officials who used the jobs argument as reasoning not to in their words “gamble” (silly word to use since there was never a question whether the center would get built) should be following through on this. Also why wasn’t there a project labor agreement put on this tied to the TIF? Couldn’t that have been something the 2010 township BOC negotiated if they were truly interested in local job creation?
I criticize public unions often. (that’s a lengthy convo we desperately need reform) But I have ZERO problem with private sector unions. Esp. trade unions. And in this case since public dollars were used to finance this project we should have absolutely REQUIRED local labor.
Wherever possible these jobs should go to Valley residents. I will monitor this.
I need to learn more here and confirm what I’m hearing. More on this soon.. If anyone else has insight here please contact me. Ronbeitler@gmail.com